Electrical Panel & Service-Entrance Upgrades

Your home’s entire electrical safety system starts at the service panel. If it’s packed with double-lugged breakers, buzzing under load, or still running on screw-in fuses, it’s time for an upgrade. Mulder Electric’s master-licensed team removes obsolete equipment, installs modern breaker panels up to 400 amps, and coordinates with Consumers Energy or DTE for a seamless same-day power restoration.

Request a Panel-Upgrade Quote

(616) 834-3800

  • Get a Free Quote in less than 24 Hours
  • Satisfaction Guaranteed

Why homeowners trust Mulder Electric

  • Utility-Approved Contractor – We work directly with utility engineers to size conductors, meter bases, and weather heads.

  • NEC Article 230 Compliance – All bonding, grounding, and disconnect rules followed—no red tags, no re-inspections.

  • Load-Calc Accuracy – We use NEC Annex D software to verify ampacity before the first breaker is landed.

  • One-Day Turnaround – 90 % of upgrades finished and power restored before dinner.

Common upgrade scenarios

Situation Our solution
Fuse box ➜ breaker panel Replace with a 100 A or 200 A Square D or Eaton load center; arc-fault & GFCI breakers where code requires.
60 A or 100 A service undersized New 200 A meter socket, #4/0 aluminum service cable, 200 A main breaker, and dual ground rods.
EV charger or hot-tub addition Add 40–100 A breaker space; install a sub-panel if circuits exceed main bus capacity.
Generator interlock switch Install UL-listed interlock kit or manual transfer switch to prevent back-feed.
Whole-home surge protection Type 2 SPD at the panel plus layered point-of-use devices for sensitive electronics.

Five-step upgrade process

 

  1. Load assessment & quote – On-site inspection, load calculation, and fixed-price proposal.
  2. Permit & utility scheduling – We pull city permits and arrange a morning disconnect.
  3. Safe shutdown & demo – Circuits labeled, old panel removed, feeders inspected.
  4. Install & torque test – New panel, breakers, grounding/bonding jumpers, surge protector.
  5. Inspection & re-energize – Inspector signs off, utility reconnects, and we perform a final infrared scan.

WE PROVIDE INSTALLATION SERVICES IN:

Most Zeeland, Holland, and Hudsonville upgrades take 6-8 hours door-to-door. Grand Rapids, Muskegon, and Kentwood jobs average 8-10 hours including utility travel time. We keep temporary generators on standby for critical medical equipment—just mention the need when booking.

Testimonials

FAQs

How do I know my panel needs upgrading?

Frequent breaker trips, warm panel covers, aluminum branch circuits, or visible rust are red flags. Homes with more than two double-pole appliances (dryer, range, EV charger) often need 200 A service.

Will the power be off all day?

Yes, but only during working hours. We schedule disconnects early and restore power the same afternoon. Critical loads can run on a temporary generator.

Do I need to be home for the inspection?

Someone 18 + must be present. We handle all inspector questions, but you’ll sign the final paperwork.

What does a panel upgrade cost?

Most 100→200 A upgrades fall between $2,100–$3,800, depending on feeder length, grounding upgrades, and surge-protection options. You’ll receive a fixed quote before work begins.

Ready to future-proof your home’s electrical backbone? Call (616) 834-3800 or click Book My Panel Upgrade to lock in a same-day assessment. All work is licensed, insured, and backed by our one-year workmanship guarantee.

Phone Number

Email Address

Get In Touch